Home

2008 Budget

Boundary Map

Burn Permits

Citizen's Academy

Communications

Contact Arvada Fire

District Board

EMS page

Fire & Life Safety Education

Fire Codes

History

Job Postings

Join the District

Operations

Retired Members

Ride Alongs

Stations

Training

Wildfire Danger

Arvada Fire breaks ground
on two new stations

With the sound of the shovels going through the dirt, the Arvada Fire District officially began construction on Station 7 and Station 8 on Monday, October 29, 2007.  The Groundbreaking ceremony for both stations took place at the Station 8 building site located at 6385 Quaker Street.  Station 7 will be built at 8027 Alkire Street.  These two stations are currently located in one building at 6651 Indiana Street.

The funding for these new stations and the new personnel that were hired to staff Station 7 was approved by the voters in November of 2005.  The new locations will allow us to have better response times for our ever-growing western population. 

The stations were designed by Allred and Associates and will be built by TC2 Construction Company.  The stations will be state of the art in both design and function and will be a great addition to the neighborhoods that they will occupy. 

Construction is expected to begin on Station 8 on Thursday, November 1, 2007 with an estimated completion date of June 2008.  Construction is expected to begin on December 1, 2007 on Station 7 with an estimated completion date of July 2008.  Ribbon cutting ceremonies and an Open House will be held at both sites.  We will will keep a journal of the construction progress on this page.

Construction Progress as of June 12, 2008:

Station 7 (8027 Alkire Street)
*Brick veneer complete
*South side metal framing complete
*Fire suppression complete & inspected
*Roof complete

Station 8 (6385 Quaker Street)
*South area drywall complete, textured and primed
*Window removal/reinstall in progress
*Emergency generator concrete pad poured

Future Work Plans (weather permitting)

Station 7 (8027 Alkire Street)
For the weeks of June 15th and 22nd:
*West side property fence
*Street Right of Way work
*North side insulation and drywall
*South side rough mechanical & electrical
*Finish Apparatus Bay rough electrical
*Apparatus Bay insulation & drywall

Station 8 (6385 Quaker Street)
For the weeks of June 15th and 22nd:
*South side walls painted
*Begin hanging south side ceiling grid
*Apparatus Bay sprinkler, mechanical & paint
*Begin North area drywall
*Site electric and concrete

Station 7 on June 9, 2008 Station 8 on June 9, 2008

 

 
Hot times cool cars
Proud member of
Safe Kids Denver Metro
Proud partner with
Ready Colorado

ParticipatingFire CorpsAgency

Back to Top Site Map